Contact US
Address: 14F Block 3 World Trade Plaza, Xuzhou City, Jiangsu Province
China
TEL: +86-516-66676818
FAX: +86-516-80296064
Website: www.ccmiecn.com
Home > News > Content
The World's First ART Demonstration Line Runs!
- Jun 12, 2018 -

636627574322962770.jpg


At 9:50 in the morning of May 8, after pressing the trial run starting device of the first Autonomous rail Rapid Transit (ART) 

Line A1 (Phase 1), the ART officially entered the three-month trial operation phase. This is another key milestone in the 

commercial application of CRRC to promote ART following the debut of ART on the demonstration line in October last year, 

which indicates that the new type of ART rail-based transport system independently developed by CRRC has been initially 

capable of commercial operation.


636627576071413841.jpg


Adoption of central island platform


The Zhuzhou ART Line A1 (Phase 1) has a total of 4 central island platforms, with a total length of approximately 3 km.

According to the planning, the total mileage of Zhuzhou ART demonstration line is 12 km, which is planned to be 

constructed in two phases. The total length of the Phase 2 is about 9 km, which will be connected with Phase 1 to form an 

ART demonstration loop line of 12 km.


636627575049924046.jpg

Improvement in safety and comfort


The safety protection facilities such as the 360-degree around view system and vehicle radar, etc. have been added, 

which monitor the surrounding road conditions and facilities in all aspects. Thereby the operational safety has been further        guaranteed. In terms of internal space layout, folding seats have been added to provide more seats, and the height and 

number of handrails have also been optimized and adjusted to provide more humanized designs.


636627576229130118.jpg


 The ancillary works such as communication signal equipment, control centers, intersection signal priority systems and road  safety facilities have been installed. Priority has been given to ART trains at intersections on the line. In simple terms, the trains give  instructions to the signal lights at a distance of 100 m away from the lights, and the signal lights adjust the traffic light  system after receiving the signals to ensure that the ART trains pass through the intersections safely and quickly with priority.


636627575414340686.jpg

10minute charging supports 25 km operation


In order to reduce the charging time, the terminal stations of the line are equipped with the train charging devices that 

adopt the short-time high-power fast charging technology. After the trains enter the station and send out a charging 

application, the charging devices will automatically switch to the power supplying state, and the trains will lift the 

pantograph to receive power. The maximum charging current can reach 1000A, charging for 10 minutes can guarantee an

endurance mileage of 25 km, which is environment protective and energy-saving!


636627576417734449.jpg


According to statistics, since the launch in June last year, more than 150 groups have visited the CRRC Zhuzhou Institute 

Co., Ltd. to study the ART trains, including more than 20 overseas cities in the United States, the United Kingdom, 

Singapore, New Zealand and Brazil, etc.


Recently, our company CCMIE has cooperated with CRRC, and supply the railway construction          machines like railway cranes and vehicles.If you want to know more, please visit:

https://cm-sv.en.alibaba.com/productgrouplist-806892462/Railway_Crane.html?spm=a2700.icbuShop.prup15aafb.9.42234af7Z9nNlh

or contact us.